Hot Wells Substation Project

CPS Energy is proposing a new Hot Wells Substation at the intersection of Avondale Ave. and Hillje St., just west of I-37. Under this proposal, the substation will increase the capacity of the electric system to support the growing power consumption in the area, and the substation will improve the reliability of electric service to homes and businesses. 

In order to minimize the construction of transmission facilities, the substation will be located next to the existing CPS Energy transmission line that runs north-south along I-37.  Also, to minimize the construction of distribution lines, the substation will be located near existing connection points to the local power system.

Please see the attached graphics for an example of a substation, an example of a distribution line, an example of a transmission line, and a map of the proposed site.

The project is in the planning phase, and we expect construction from June 2011 to July 2012. Construction activities will occur on and around the new substation site. These activities will include clearing and leveling the site, installing foundations, erecting poles and structures, and installing power lines and related equipment.

This website will include regular updates on the project as steps are completed. In addition, you may call or write to:


Hector V. Torres, Senior Project Manager
(210) 353-2404
Hot Wells Substation Project
Mail Code 111008
CPS Energy
P.O. Box 1771
San Antonio, Texas 78296-1771
(210) 353-6104
hvtorres@cpsenergy.com